Maintenance to be carried out on the Dry Chemical Powder system of gas carrier?« Back to Questions List

Posted by marinetales
Asked on June 30, 2021 2:54 pm

The Powder system would have a visual inspection on a monthly basis and every 3 months the powder tank/container would be opened to check that the powder is not congealing or caking. The system would also be subject to annual shore service which would include a powder analysis to ensure the moisture content was to high. Actuator valves and pressure relief valves would be subject to inspection and test under the ship’s planned maintenance schedule.

Posted by marinetales
Answered On June 30, 2021 2:58 pm